Skip to content

Manufacturing

Brownfield upgrades in planned windows, energy on the P&L, and predictive maintenance where a stopped line costs the most.

Manufacturing plants are where our brownfield discipline was learned. A line that runs three shifts has a maintenance window measured in hours, and everything we do is planned around it.

What manufacturers come to us for

  • Line upgrades without a long stop. New controllers, drives and operator interfaces, built and tested off site, cut over in a planned window with a rollback path. See plant automation.
  • Energy as a line on the P&L. Metering to the line, compressed air and HVAC control, and scheduling of energy-intensive steps. See energy management.
  • Predictive maintenance on the assets that stop the line. Conveyors, compressors, presses and packaging machines. See predictive maintenance.
  • Traceability. Integration between the control layer and MES or ERP so batch and serial records are captured automatically.

Sub-sectors

Sector Typical work
Automotive and tier suppliers Body shop and paint shop control, drive upgrades, energy in paint and press shops
Food and beverage Batch control, clean-in-place automation, refrigeration energy
Pharmaceuticals Validated batch systems, audit trails, data integrity
Electronics and packaging High-speed line integration, predictive maintenance on handling equipment

A customer's view

A packaging manufacturer with no tolerance for a mid-week stop put it simply after three line upgrades: "Every upgrade since you started has gone in over a weekend. The previous vendor needed a week." Read more on the customer stories page.

Talk to sales about your plant.